合肥生活安徽新聞合肥交通合肥房產(chǎn)生活服務合肥教育合肥招聘合肥旅游文化藝術合肥美食合肥地圖合肥社保合肥醫(yī)院企業(yè)服務合肥法律

        代寫MATH6119、Python/c++編程語言代做

        時間:2024-05-15  來源:合肥網(wǎng)hfw.cc  作者:hfw.cc 我要糾錯



        Case Study - Information Sheet
        Printed Circuit Board Assembly
        1 Background
        Philips Electronics produces printed circuit boards (PCBs) for use in consumer electronics (audio and video equipment, personal computers) and in professional industries
        (telecommunication systems, aircraft navigation, medical equipment). Special machines
        are used to mount components onto the boards. The problem to be considered is one
        of production preparation: for each type of PCB, it is necessary to specify the way in
        which the components should be mounted.
        This case study is based on work carried out for one of the major product divisions
        of Philips. Although some simplifications have been made to the original problem, this
        does not affect the main characteristics of the decisions that have to be taken.
        2 Assembly of PCBs
        PCBs are assembled by automated machines. A conveyor feeds each board into the first
        machine, and transports the boards between machines. Thus, a board passes into the
        first machine where a selected subset of components are mounted, then passes to the
        second machine where further component mountings are performed, and so on, until the
        last machine completes the PCB. The conveyor moves all partially assembled boards to
        the next machine simultaneously. Thus, the conveyor only moves when every machine
        has completed its work on a board. For example, if there are eleven components to be
        mounted by three machines, A, B and C, where machine A mounts components 1, 2,
        3 and 4 and takes 8 seconds, machine B mounts components 5, 6 and 7 and takes 12
        seconds, and machine C mounts components 8, 9, 10 and 11 and takes 9 seconds, then the
        conveyor moves the boards every 12 seconds. Consequently, the first PCB is completed
        after 36 seconds, and a further PCB is completed at the end of each subsequent 12-second
        interval.
        The components to be mounted on the board are contained in feeders on one side of
        the conveyor. The components are classified into different types, and each feeder only
        contains components of a single type.
        Each machine has a robot arm with three heads. The heads are each fitted with a
        piece of equipment which can pick components from the feeders and subsequently place
        them on the board. At most one component at a time can be carried by a head. Note that
        each component type can only be handled by a subset of the set of head equipments. In
        other words, a head with a given piece of equipment can only pick and place components
        of a limited set of component types.
        The mounting process consists of a sequence of pick-and-place moves. In the picking
        phase, the heads pick a component from the relevant feeders in turn. The order is
        fixed: the first head picks first, then the second, and finally the third head. During
        1
        the placing phase, the robot arm moves to appropriate points on the board so that
        the components can be sequentially mounted. In contrast to the picking, the order in
        which the components are mounted can be chosen. Note that it is possible to choose
        pick-and-place moves in which only one or two of the three heads are used.
        To illustrate the process, consider the following example in which a single machine is
        used to mount five components on a board. There are two components of type α, one of
        type β, and two of type γ. The feeders for these component types have coordinates (5,
        0), (10, 0), and (15, 0), respectively. Further, the two α components have to be mounted
        at locations with coordinates a1 = (10, 2) and a2 = (10, 12), the β component has to
        be mounted at a location with coordinates b1 = (6, 5), and the two γ components have
        to be mounted at locations with coordinates c1 = (15, 8) and c2 = (14, 16). Suppose
        that, on the first pick-and-place move, the second α component is assigned to head 1,
        the β component is assigned to head 2, and the first γ component is assigned to head
        3, and that these components are mounted in the order γ, α and β. Then, the robot
        arm moves successively between locations (5, 0), (10, 0), (15, 0), (15, 8), (10, 12) and
        (6, 5): a total distance of 5 + 5 + 8 + √
        41 + √
        65 = **.49. Suppose that on the second
        pick-and-place move, the first α component is assigned to head 1, and the second γ
        component is assigned to head 2, and that these components are mounted in the order
        α and γ. Starting at the location (6, 5) where the last component was mounted on the
        previous move, the robot arm moves successively between locations (5, 0), (15, 0), (10, 2)
        and (14, 16): a total distance of √
        26 + 10 + √
        29 + √
        212 = 35.04. These pick-and-place
        moves are illustrated in Figures 1a and 1b, respectively.
        Figure 1: (a) First pick and place move; (b) Second pick and place move (the solid line
        denotes the route travelled by the arm during this move)
        2
        3 Throughput
        It is required to maximize the throughput of the assembly line, which is determined by
        the machine with the heaviest workload. The workload of a machine is proportional to
        the total distance travelled by the robot arm. In computing this distance, you should
        assume that, when the conveyor moves, the robot arm remains at the position where the
        last component was placed until the new board arrives. Increased throughput is achieved
        by:
        • avoiding large movements of the robot arm;
        • balancing the workload between machines.
        The scheme that is selected should minimize the time required for the busiest machine
        to complete all of its mounting operations.
        4 Data
        Relevant data for the problem are as follows. There are three machines, and 102 components to be mounted on the board. The components are of 10 different types, which are
        labelled as type A, type B, etc., up to type J. There are nine pieces of equipment which
        are to be fitted on the heads, and no piece of equipment is duplicated. The following
        table lists the equipment, giving the component types that each piece of equipment can
        handle.
        Piece of equipment Types of components that can be mounted
        Figure 2 displays the feeder positions, and shows the positions of the component
        types on the board. The feeders for components of types A, . . . , J have coordinates (2,
        0), . . ., (11, 0), respectively. The board is depicted below the feeders. The components
        to be mounted at the top of the board have coordinates (1, 2), . . . , (12, 2), and the
        components to be mounted at the bottom of the board have coordinates (1, 13), . . . ,
        (12, 13). There are some locations on the board where no component is to be fitted.
        For example, no component is required at the position with coordinated (9, 5), while a
        component of type J is to be mounted at the position with coordinates (10, 5).
        Note that the times required to pick a component from a feeder, to mount a component on a board, and to move the board on the conveyor are neglibible.
        eeders
        Figure 2: Layout of the PCB board
        請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp









         

        掃一掃在手機打開當前頁
      1. 上一篇:代做DTS204TC、代寫Java編程語言
      2. 下一篇:CSC4140代做、代寫Python/Java編程設計
      3. 無相關信息
        合肥生活資訊

        合肥圖文信息
        急尋熱仿真分析?代做熱仿真服務+熱設計優(yōu)化
        急尋熱仿真分析?代做熱仿真服務+熱設計優(yōu)化
        出評 開團工具
        出評 開團工具
        挖掘機濾芯提升發(fā)動機性能
        挖掘機濾芯提升發(fā)動機性能
        海信羅馬假日洗衣機亮相AWE  復古美學與現(xiàn)代科技完美結合
        海信羅馬假日洗衣機亮相AWE 復古美學與現(xiàn)代
        合肥機場巴士4號線
        合肥機場巴士4號線
        合肥機場巴士3號線
        合肥機場巴士3號線
        合肥機場巴士2號線
        合肥機場巴士2號線
        合肥機場巴士1號線
        合肥機場巴士1號線
      4. 短信驗證碼 酒店vi設計 NBA直播 幣安下載

        關于我們 | 打賞支持 | 廣告服務 | 聯(lián)系我們 | 網(wǎng)站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

        Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網(wǎng) 版權所有
        ICP備06013414號-3 公安備 42010502001045

        午夜精品一区二区三区免费视频| 国产日韩一区二区三区在线播放| 久9久9精品免费观看| 久久精品国产72国产精福利| 日韩国产精品视频| 国产精品96久久久久久久| 久久亚洲精品无码av| 久久精品国产99国产精品导航| 久久99精品久久久久久综合| 亚洲精品无码专区久久久| 精品国产福利尤物免费| 免费精品国自产拍在线播放| 日韩免费人妻AV无码专区蜜桃| 国产成人综合久久精品亚洲| 日韩精品福利视频一区二区三区| 无码日韩精品一区二区免费| 99视频精品全部在线观看| 91精品视频观看| 亚洲国产精品综合一区在线| 老子午夜精品无码| 91精品视频播放| 真实国产乱子伦精品免费| 性欧洲精品videos| 亚洲精品国产成人99久久| 亚洲爆乳精品无码一区二区三区| 国产精品亚洲精品日韩已满| 精品久久久久久国产91| 国内精品久久久久影院优| 国产AV午夜精品一区二区三| 手机在线观看精品国产片| 免费精品久久天干天干| 亚洲精品乱码久久久久久蜜桃不卡| 最新国产成人精品2024| 国产亚洲美女精品久久久2020| 日日噜噜噜噜夜夜爽亚洲精品| 国产午夜精品一区二区三区| 国产精品免费一区二区三区四区| 久久精品视频一区二区三区| 亚洲国产精品热久久| 久久久久女人精品毛片| 精品日韩99亚洲的在线发布 |